Projects
- FDOT No. 420809-3-52-01 I-595 Express Corridor Improvements Project Design Build
- Independent Verification for FDOT District 4 and 6 Laboratory including materials testing for asphalt, soils and concrete.
- $1.8 Billion total contract
- FDOT No. 406147-1-52-01 Sawgrass Expressway widening from Atlantic Blvd. to Coral Ridge Design Build
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $13 Million Total contract
- FDOT No. 249856-4-52-01 Thirteen miles of widening and reconstruction of SR 5 and US1 from mile marker 124 south to 113 in the Florida Keys
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $110 Million Total contract
- FDOT No. 249356-1-52-01 Milepost 0.362 North of the Miami-Dade/Monroe County lime to Milepost 4.150 in Miami-Dade
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $42 Million Total Contract
- FDOT No. 87075-34444 I-75 Rest Area at MP 31 on Alligator Alley in Broward County
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $25.5 Million Total Contract
- FDOT No. 249651-1-52-01 SR-826 (Palmetto Expressway) at NW 58th Street.
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $15 Million Total Contract
- FDOT No. 11204 Design Build-Northbound SR-112 to Okeechobee Rd.
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $12.2 Million Total Contract
- FDOT No. 229499-1-52-01 SR 80 at the Florida Turnpike- Roadway and Bridge Construction
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $25 Million Total Contract
- FDOT No. 415456-1-52-01 I-95 Rehabilitation project, all aspects of Quality Control and material testing for this 14 mile project that involved removing and replacing.
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $17 Million Total Contract
- Miami Dade County Project #B311A, B313A and B315A Miami International Airport concourse J and E and the runways
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $100 Million Total Contract
- FDOT No. 249581-1-52-01 – SR 826/SR 836 Interchange Reconstruction – Design Build
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $560 Million Total Contract
- MDX Project No. 87409.030 – SR 874 Mainline Reconstruction Design Build
- Quality Control and Materials Testing including field and laboratory inspection for asphalt, soils and concrete
- $75 Million Total Contract
|
|
|